Went for a ride today to discover that the 56 bike path is now open all the way through.  With .7 miles of new asphalt where the construction was being done.
Title: Re: 56 Bike path is open!
Post by: Judy Frankel on March 18, 2011, 03:28:13 PM
All the way.through where. To the coast. It was not last week  only the east end was
Title: Re: 56 Bike path is open!
Post by: raleigh on March 18, 2011, 07:06:24 PM
A portion of the path has been closed down for several months for some type of construction...sewer, water or something like that. It is now open all the way through as in end to end.
Title: Re: 56 Bike path is open!
Post by: Paul Nevins on March 18, 2011, 09:05:14 PM
Rode it yesterday, watch out for water over the path at the golf course.