Went for a ride today to discover that the 56 bike path is now open all the way through. With .7 miles of new asphalt where the construction was being done.
All the way.through where. To the coast. It was not last week only the east end was
A portion of the path has been closed down for several months for some type of construction...sewer, water or something like that. It is now open all the way through as in end to end.
Rode it yesterday, watch out for water over the path at the golf course.